A. Subject of this Page on Wuxi JACK H Beam Assembly and CO2 Tack Welding Machine:

1. This thematic page briefs on technical strong points of Wuxi JACK Z models T Beam H Beam Assembly Machine, for customers getting impression on this machine with quick review;

 

2. Contents of This Page on T Beam H Beam Assembly Machine:

This page has 6 main sections of:
1) Slides review on the machine--- Technical features;
2) Structure of the machine--- Major parts;
3) Electric control system of the machine--- PLC and A.C. inverter;
4) Operation on the machine --- Prepare, daily operation, operating panel;
5) FAQ on the machine;
6) List of other machines and equipment in H Beam Production Line
3. Assembled H Beam with segment of CO2 tack welding seam, produced from Wuxi JACK H Beam Assembly and CO2 Tack Welding Machine: (Fig.1)

4. Related Pages:
1) T Beam H Beam Assembly Machine --- Overall and detailed introduction, photos, videos, parameters;
2) H Beam Production Line --- Application site of the machine and other related equipment;
3) CNC Strip Plate Cutting Machine --- Cut flange and web for subsequent welding H Beam production

Section 1 Slides Review on Wuxi JACK T Beam H Beam Assembly Machine Technical Features

Slides 1: The Highly Reliable and Accurate Central Function of Wuxi JACK T Beam H Beam Assembly Machine:

1. The Two Main Functions in the Machine:
1) Assembly: Fitting up steel strips into T Beam and H Beam, making sure its flange and web to be centrally aligned in accurate position;
2) Tack Welding: To prevent the assembled T Beam H Beam from falling apart, implement CO2 welding on the workpiece simultaneously;

 

2. High Quality and Efficiency Operation of Wuxi JACK T Beam H Beam Assembly Machine:

This page of slides elaborates on how does the machine completes the above two main functions with units of:

1) Assembly Unit in T Beam H Beam Assembly Machine:

a) H Beam Assembly: There are 8 pairs of symmetric arranged alignment rollers in different height level, which are used for pushing and securing the flanges and web into correct position;
b) Reliable and Smooth Drive: To fully guarantee tight and firm clamping of flange and web, movement of these alignment rollers are driven with hydraulic oil cylinders, and guided with high precision gloss bushings;
c) Precise Positioning: These alignment rollers are all eccentric type, which have ability of inching adjustment, delivering the most accurate fitting up effect on flange and web;

 

2) Tack Welding in H Beam Assembly and CO2 Tack Welding Machine:

a) Welding Torches: As shown in this slides, in one set of the machine, there are 2 sets of CO2 welding torch in 45° mirror installation, for welding the 2 pieces of joint seams on H Beam at the same time;
b) Position Control: The position of these 2 welding torches can be adjusted precisely, based on specification of fabricated H Beam, by means of handwheels and precise linear guiderails on cross slides at its back side.

Slides 2: The Powerful Function Supporting Elements in Wuxi JACK H Beam Assembly and CO2 Tack Welding Machine

The successful completion of central tasks can not be fulfilled without the support from function assistant elements. And this page of slides is for discussing on this topic:

1. Hydraulic System in T Beam H Beam Assembly Machine:

1) Driving Purpose: As mentioned previously, to guarantee sufficient driving force, the fitting up of flange and web is driven with hydraulic oil cylinders;
2) Composition: Hydraulic system has its independent oil pump station, which has good radiation, as shown in lefthand photo of this slides page;
3) Acting Elements: Fine filters on oil pump station makes sure long term reliable working of electro-magnetic valves, which are critical working elements in hydraulic system;
 

2. PLC Control in T Beam H Beam Assembly Machine:

1) Uniqueness: T Beam H Beam Assembly Machine is the only automatic equipment in I H Beam Production Line, which has its electric control system equipped with PLC (Programmable logic controller), due to relative complicated control logic;
2) PLC Function: By means of PLC control, length of each segment tack welding seam and interval between 2 adjacent seams can be set up by customer operators, based on process technology requirement on T Beam H Beam fabrication;
 

3. VF Inverter Control on Working Speed of H Beam Assembly and CO2 Tack Welding Machine:

1) Purpose: To have a precise and smooth management on assembly/ Tack welding/ And sending forward velocity of T Beam H Beam during its assembly,
2) Accurate Management: Working speed on T Beam H Beam assembly and CO2 tack welding is precisely and continuously controlled with A.C. inverter (VF: Short for Variable Frequency Drive), and displayed real time in digital form, on operating panel of the machine.

Slides 3: The Reliable and Precise 2 Stages Assembly in Wuxi JACK T Beam H Beam Assembly Machine

1. This page slides gives panorama view on machine working zone at customer site;
2. Infeed conveyor roller tables are at left back side of main frame; Outfeed conveyor roller tables are at right front side. Which means, the workpieces (flange and web) flow direction in this photo is from left to right;
3. Why need 2 Stages Assembly: As can be seen from photo in this slides, considering long length of T Beam H Beam and correspondingly large assembly zone, solitary precise assembly step discussed before is not sufficient to acquire firm fitting up on flange with web. For this reason:

 

4. T Beam H Beam Assembly Machine has Double Assurance Mechanisms of 2 Stages Assembly:

1) Installation Position: Shown in the slides, there are 3 pairs of yellow color pulling rod boxes deployed in regular interval, along infeed roller table of the machine, for performing on preliminary positioning and clamping on flanges with web;
2) Drive Way: Same as the central zone precise alignment eccentric rollers, these pulling rod boxes are also driven with hydraulic oil cylinders, considering the necessary heavy and reliable driving force;
3) Hydraulic drive pulling rod boxes (Manipulators) working as 1st step assembly function mechanism: (Fig.2)

 

Slides 4: The Smooth/ Heavy Force, and Precise Guiding of Downward Pressing Roller in Wuxi JACK H Beam Assembly and CO2 Tack Welding Machine:

1. Role for Assembly: As we know, during work period, T Beam H Beam is in the position of vertical orientation. So, its reliable and accurate positioning is of vital importance for guaranteeing on high standard assembly effect;
2. Implementation Way: This job is performed by means of the overhead downward stroke pressing roller, which is installed into machine mechanical U frame, and moves downward for holding the H Beam firmly, as indicated in the 2 photos of this slides;
3. Powerful Drive and Smooth Guide: Illustrated in this page of slides, downward movement of this pressing roller is also driven with hydraulic oil cylinders, and guided with precise linear guiderail, fully guaranteeing its reliable and smooth movement.

Slides 5: The Newly Produced Wuxi JACK Z15 Large Capacity T Beam H Beam Assembly Machine in Year 2025

1. As Part of HB1500 Fully Automatic H Beam Production Line in Year 2025:

In year 2025, from Spring to Summer, from March to August, Wuxi JACK designed, produced and delivered two and half automatic H Beam Production Line to Russian dealer customer, covering machines and equipment of:
1) Z15 T Beam H Beam Assembly Machine, 2 sets;
2) LHC H Beam SAW Welding Machine, 12 sets;
3) YTJ80 hydraulic drive H Beam Flange Straightening Machine, 2 sets;
4) HJ300 H Beam Horizontal Press Longitudinal Straightening Machine, 2 sets;
5) YF1520 motorized moving hydraulic drive H Beam 90° and 180° Turnover Machine, 4 groups each;
6) Hydraulic drive H Beam lifter and Conveyor, 8 sets;
7) Line use motor drive automatic conveyors, 80m length;


2. H Beam Specifications Produced from H Beam Production Line:

1) Finished welding H Beam diagram: (Fig.3)
  
2) H Beam flange thickness T:  6- 100mm;
3) H Beam flange width B:       150- 1000mm;
4) H Beam web thickness A:    6- 60mm;
5) H Beam web height H:          200- 1500mm;
6) H Beam length L:                  4000- 15000mm;
This page takes snapshot on producing the 2 sets of Z15 T Beam H Beam Assembly Machine in Wuxi JACK workshop in the process: Assembly and performance test, after painting:

Slides 6: Different Models of Wuxi JACK T Beam H Beam Assembly Machine Supplied to Customers from Year 2009 to Year 2025

1) Over the past 17 years, by January 2026 year, Wuxi JACK has produced and delivered over 150 sets of the H Beam Assembly and CO2 Tack Welding Machine, of different models and configurations, either as individual equipment, or part of automatic H Beam Production Line;
2) This Slides paste some of these products, photos taken at customer workshop:

Section 2 Structure of Wuxi JACK H Beam Assembly and CO2 Tack Welding Machine

1. Main Units of T Beam H Beam Assembly Machine:

This machine is mainly composed of:
1) Mechanical main body, including U frame and base bed, together with central operating units of assembly and CO2 welding unit on its base bed;
2) Infeed and outfeed conveyor roller tables;
3) Welding torches and its positioning mechanisms, 2 sets in symmetry;
4) Hydraulic manipulators (Pulling rod box), 2- 3 pairs;
5) Outsourced CO2 welding power supply, 2 sets;
6) Hydraulic system: independent pump station, electromagnetic valves, hoses;
7) Electric control system, control board, operating panel and cable routing;
 

2. Mechanical Main Frame of T Beam H Beam Assembly Machine:

This general assembly has main units of top gantry, base bed, motor reducer, hydraulic system, and electric control system:

1) Top Gantry U Frame in H Beam Assembly and CO2 Tack Welding Machine:

a) This unit includes: Top horizontal beam, vertical column, elevating beam, downward pressing roller, and downward drive oil cylinder;
b) Its main function is to hold down and press firmly H Beam web of various specifications during assembly and CO2 tack welding;

2) Base Bed in H Beam Assembly and CO2 Tack Welding Machine:

a) Based bed is composed of: Two pieces of wall boards and one piece of bottom horizontal beam. There is welding arc guide mechanism, web and flange clamping mechanism, and main transmission unit installed on this base bed;
b) Function of the base bed in the machine is to position and grip diversified specifications of T Beam H Beam, and implementing on spot welding along with H Beam transportation forward;

3) Motor Reducer in T Beam H Beam Assembly Machine:

a) Motor reducer drives driving rollers into revolve by way of coupler;
b) The installation of the motor reducer onto machine main frame is in the way of splitting type, for the purpose of easy package and shipment;
 

3. Input and Output Conveyor of T Beam H Beam Assembly Machine:

1) Standard length of input and output conveyor roller table is 8m each;
2) Both the infeed and outfeed conveyor are in the form of 3 segments, 2.6m length each segment. Of the 3 segments, one is drive type, the other two segments are idle (follower) type roller tables;
3) Length of infeed and outfeed conveyors can be special made based on customer demand on the H Beam assembly operation;
4) With manual tack welding, conveyor moves in constant speed, which is also manual welding velocity.

Section 3 Electric Control System of Wuxi JACK T Beam H Beam Assembly Machine

1. A.C. Inverter in T Beam H Beam Assembly Machine:

1) Task: A.C. inverter works in couple with the PLC, to control the CO2 tack welding speed during H Beam assembly;
 

2) Compound Control on Work Velocity in H Beam Assembly and CO2 Tack Welding Machine:

To acquire on extensive range of working speed manage, there are double levels of speed control:
a) Variable frequency change: Based on parameters such as H Beam thickness, there are 8 options of output frequency from the A.C. inverter, which can be set up ahead of time into PLC user program. By means of dial switch on front cover of A.C. inverter, tack welding velocity can be switched among these 8 stages of frequency;
b) Continuous working speed: On the basis of selected frequency, and by means of turning speed knob on machine operating pendant, the desired speed can be modulated conveniently and intuitively;
 

2. PLC Role in H Beam Assembly and CO2 Tack Welding Machine:

1) PLC Operates as Brain of T Beam H Beam Assembly Machine:

a) Selection among the three working modes of Manual/ Single/ Auto;
b) The assembly steps of eccentric alignment rollers act;
c) Set up process parameters of CO2 tack welding seam on assembled T Beam H Beam;
Are all controlled with PLC, making the machine working in unified command;
 

2) PLC Control CO2 Tack Welding in H Beam Assembly and CO2 Tack Welding Machine:

a) Tack Welding Mode: Compared with the subsequent step of H Beam SAW welding, H Beam assembly and tack welding operation is in the form of low current intermittent welding (max. 500A, working current usually 160- 350A), instead of large current continuous welding in SAW (Up to 1000A or 1250A);
b) For this reason, during operation of H Beam Production Line, it is very important to have proper management on welding process parameters, including:
 -- Length of each segment welding seam;
 -- Interval between welding seams;
 -- Welding current for each segment of welding seam;
 

c) PLC Value for T Beam H Beam Assembly Machine:

 -- Under manual control mode of machine, it is difficult to deliver consistent welding seams on all the finished assembled H Beam;
 -- While under automatic control working mode, by means of parameters preset into the PLC, a batch of unison tack welded H Beam can be expected for sure;
d) Besides, just to modify the aforementioned parameters in PLC and A.C. inverter, can the form of H Beam tack welding seams to be changed at will.
3. As to brand of PLC and A.C. inverter of Wuxi JACK Z series T Beam H Beam Assembly Machine, we always select renowned suppliers in the industry, such as Scheider;
4. Technical documents of PLC and A.C. inverter are delivered to customer as part of technical documents, together with machine manual book, at delivery of machine. Nowadays by year 2026, these technical documents are usually in the form electronic version

Section 4 Operation on Wuxi JACK T Beam H Beam Assembly Machine

1. Prepare on Official Running of T Beam H Beam Assembly Machine:

1) Raw Material: The flange and web cut from CNC Strip Cutting Machine should be straight and flat. If there exist unevenness or bending of the long and narrow plates surface, it should be straightened ahead of time, before being sent to the machine for assembly;

2) Trial Run on T Beam H Beam Assembly Machine:

This should have last for period of one week, to check on:
a) Safety precaution;
b) Working condition;
c) Coordination and WIP (Work in process) transfer into and out of the machine;
d) Operator familiarity with the machine;
e) Quality assurance etc.;
 

3) Related Documents of Work instruction on H Beam Assembly and CO2 Tack Welding Machine:

It is suggested that customer prepare documents of the machine by teamwork, before official put into use of the machine:
a) PFMEA (Process Failure Mode Effect Analysis);
b) Control plan;
c) Work instruction;
d) Inspection check List
Of the machine at the completion of its trial run; Review these documents periodically, and have update on it with continuous improvement ideology;
 

2. Work Control in H Beam Assembly and CO2 Tack Welding Machine:

1) Durable: All the main mechanical structures of machine are welding structure, with strong intensity and light weight. After welding, all the critical welding structure members are stress relieved by means of heat treatment, making sure the machine durable and has no deformation;
2) Reliable: The positioning and clamping on workpiece (Flange and web) are driven with hydraulic system. The manipulator (Pulling rod system) achieves preliminary positioning of flanges and web, on the input conveyor roller tables;
3) Accuracy: The central alignment unit at gantry of mechanical main body accomplishes on precise alignment and clamp (Final assembly) of T Beam H Beam flange and web respectively.

Section 5 FAQ on Wuxi JACK T Beam H Beam Assembly Machine

Section 6 List of Wuxi JACK Other Steel Structure Machines in T Beam BOX Beam H Beam Production Line

DX1520 BOX H Beam End Face Milling Machine at South Korean Customer Facility
CNC-CG3500 CNC Plasma Flame Cutting Machine with Flame Strip Cutting Torches at Argentina Rosario
LHA5C H Beam Gantry Welding Machine at Bangladesh Customer Facility, side operation type
YTJ60 Hydraulic H Beam Straightening Machine, flange, at Chinese Customer Factory
UBZ12 BOX Beam Assembly Machine, 1 set
LHC12 BOX Beam Welding Machine, 4 sets
ASM63 L Angle Steel Straightening Machine, test at Wuxi JACK workshop
Hydraulic drive Steel H Beam Lift and Conveyor, ready for shipment at Wuxi JACK
MP20 Plate Butt Joint Welding Machine at Russian Customer Facility
SXBJ12 Double Heads Long Stroke Edge Milling Machine
YF1520 Hydraulic Drive BOX Beam H Beam 180° Overturning Machine
RH3000 Steel Plate Edge Rounding Machine, up to 3,000mm plate width
01

02

03

H Beam Assembly and CO2 Tack Welding Machine Blogs

WUXI AMASS MACHINERY CO., LTD
WUXI JACK TECHNOLOGY CO., LTD
0510-83297829
English Language: 15852755799; 
Chinese Language: 13621515089
No. 2, Ouyang Road, Luoshe Town, Wuxi City, Jiangsu Province, China

CONTACT US

© Wuxi AMASS Machinery Co., Ltd  2021 All Rights Reserved.
备案证书号: 苏ICP备13045244号-1