1) Background: A good beginning is half success. For delivering the best and consistent performance of the 3 in 1 H Beam Assembly Weld Straighten Integral Machine (Or called: Pull Through H Beam Welder equipment), the proper hoist, and installation on the machine is one of the preconditions;
Here we will discuss a bit on this aspect: What should be done for the successful initiation of the 3 in 1 H Beam machine:
a) Hoist of the machine;
b) Mechanical System Installation of the machine:
c) Electric System Installation and SAW Power Supply of the machine
1) Unloading: The vehicle for transportation of the 3 in 1 Integral Function H Beam Welding Machine should be parked alongside main isle of workshop, and close to its gate;
2) Hoist: The machine should be hoisted out of transporting carriage of the vehicle and onto workshop floor in perpendicular position. Do not hoist in oblique way;
3) Location: The storage and transportation signs conform to the national standard of country this 3 in 1 I H Beam Fabrication Machine used (In China, it is GB/T191);
4) Caution Against: No hitting/ tipping/wet with rain and shown happened on the machine;
Locating and installing Wuxi JACK PHJ15 model 3 in 1 H Beam Fabrication Machine at a customer new workshop: (Fig.1)
1) Check On Arrival: At the delivery of customer site, please check quantity and type of subassemblies/ components of the Pull Through H Beam Welder machine with its shipping list and packing list. And check carefully whether there is spoilage / deficiency of units happened;
2) Foundation Prepare: Foundation of the machine is ready for installation. Wuxi JACK will give customer foundation drawing ahead of time;
3) Preparation Work: Before installation, clean and degrease all the parts/ elements of mechanical system of the 3 in 1 H Beam machine;
4) Make Levelness of Machine Bed: Make leveling of the machine main body after its hoisted into foundation; Then put on anchor bolts, and make the second time cement pouring for fixation;
5) Cement Pouring: Mechanical main body of the Pull Through H Beam Welder equipment needs to be poured with concrete two times, and only after the sufficient curing period of concrete, can anchor bolts be secured;
6) Conveyors Deployment: Input and output conveyors of the 3 in 1 H Beam machine should be fixed by means of expansion bolts based on foundation drawing;
7) Adjusting on Conveyor: Make adjustment on height of roller table surface of conveyor, making it consistent with, or slightly lower than surface height of the main driving roller of the machine;
Deploying, adjusting and fixing mechanical main frame together with input and output conveyors of Wuxi JACK 3 in 1 H Beam Assembly Weld Straighten Integral Machine: (Fig.2)
1) Main Units: Electric control system of this machine is composed of one set of electric control cabinet and one piece of operating panel;
2) Respective Position: Of which, the control cabinet should be put alongside mechanical main body of the machine, and operating panel is installed on the right or left column of the machine main body. This is for the purpose of easy and user friendly operation;
a) Cable Terminal Connection: When making wiring on the 3 in 1 H Beam machine, please take great care on make sure that, each piece of the wire is connected with its terminal inside control cabinet and operating panel correctly, without false;
b) Rule of Connection: The wire number of up (Terminal) and lower (Wire) should be identical, as is seen in below illustration:
Electric control board of Wuxi JACK 3 in 1 Integral Function H Beam Welding Machine: (Fig.3)
c) Check Way: Need to check whether there is issues of miss connection or wrong connection. Only after confirming on full proof wiring, can the power switch be closed for power on of the 3 in 1 I H Beam machine;
d) Proof: By this time, power indicating lamp on the operating panel should illuminates;
a) Potential Risk: There is distinction in wirings, control cables and welding cables of SAW (Submerged arc welding) power supply and its control console equipped in the Pull Through H Beam Welder equipment, please do not make confused;
b) Guidance Document: For detail, the manual book of SAW power supply gives particular instruction inside, which will be provided to customer together with operating manual and other technical documents of the machine;
Operating panel and SAW power supply control consoles in Wuxi JACK 3 in 1 H Beam Fabrication Machine: (Fig.4)
1) Customer should keep properly all the technical documents of the 3 in 1 I H Beam machine, in case anytime necessary to consult it:
2) Product certificate of the ;
3) Operating manual/ Electric diagram/ Foundation Drawing/ Hydraulic Diagram of the Pull Through H Beam Welder;
4) Operating manuals of SAW power supply/ A.C. Inverter equipped in the 3 in 1 H Beam machine;
5) Besides this 3 in 1 H Beam Welding Machine, as a professional supplier on welding and cutting equipment, Wuxi JACK also design and produce series of other best selling products of both standard and tailor made. For example, T Beam Production Line, and H Beam End Face Milling Machine, etc. For your interest, please check the corresponding product sections.